If your home is in Old Towne or one of Orange’s Eichler tracts, most exterior work goes through the City’s design review. This page explains which review your project needs and what the design standards say, in plain language. You can also ask the helper.
Exempt, staff review, or the Design Review Committee
Windows, roofs, solar, fences, additions and more
How design review fits with a contract
This is a summary of the City’s published documents, not an official City page. The City of Orange’s Historic Preservation staff makes the final call on every project.
Is your home in a historic district?
Design review applies to properties in Orange’s historic districts. Two sets of design standards cover them, one for Old Towne and one for the Eichler tracts.
Old Towne historic districts
Three overlapping districts, together called the Old Towne historic districts:
- The National Register Plaza Historic District: the four commercial blocks around Plaza Park.
- The National Register Old Towne Orange Historic District.
- The local Old Towne Orange Historic District: about a square mile of homes, shops, churches and packing houses around downtown. It includes the Cypress Street Barrio.
Most contributing buildings are bungalows, hip-roof cottages, Craftsman, Victorian and Mediterranean Revival houses, according to the City’s 2010 inventory.
Eichler tracts
Three mid-century tracts built by Joseph Eichler’s company, each an Eichler Tract Overlay Zone:
- Fairhaven (1960)
- Fairmeadow (1962)
- Fairhills (1964)
The standards protect the post-and-beam forms, low rooflines, vertical-groove siding, glass walls and open front yards that define these neighborhoods.
Contributor
Built during the district’s period of significance and still looks the part. Historic garages and outbuildings usually count too. Contributors get the full set of standards, and only contributors can qualify for the Mills Act.
Non-contributor
Built later, or changed so much it no longer reads as historic. It still goes through design review. The standards for non-contributors focus on fitting the street. A house over 40 years old may also be significant in its own right, so check with staff early.
Not sure which you have? Call Historic Preservation staff at 714-744-7200, or check the City’s Historic Preservation page.
Which review does my project need?
There are three levels. The same table applies to contributors and non-contributors. Staff can send any project up to the Committee if it is complex.
No design review
Maintenance with no change in design or materials, repainting already-painted surfaces, interior work, and most planting.
Minor Design Review
Filed with the Planning Division. If it’s complete and meets the standards, it can often be approved at the counter. Building permits may still be needed.
Design Review Committee
Five appointed professionals at a public meeting. Staff reviews within 30 days, then schedules the meeting. Permits are issued after a 15-day appeal period.
| Project | Review |
|---|
How to plan a project that gets approved
Both sets of standards recommend the same seven steps.
Read the standards that apply
Find the sections that cover your work: building features, setting, additions or new construction.
Know your house
List its character-defining features (porch, windows, rafter tails, beam ends, siding) and how the project touches them. Look at how it will fit the street.
Talk to staff first
The City strongly recommends meeting Historic Preservation staff before final drawings. They can flag conflicts early.
Get professional help
An architect or designer with preservation (or mid-century) experience isn’t required, but clear drawings save time and money.
Submit a complete application
Use the Minor Design Review form for staff-level work, or a Design Review application for Committee work. Include a site plan, elevations, photos and product information.
Staff review
Complete minor projects that meet the standards can be approved at the counter. For Committee projects, staff reviews within 30 days and may ask for changes.
Attend the DRC meeting
Bring your designer. The Committee can approve, approve with conditions, deny, or continue the item. Its decision can be appealed to the Planning Commission.
Key design standards by topic
The main points from each document, side by side. In the standards, “shall” is a requirement and “should” is strong guidance. Open a topic to see both districts.
Design review and your Mills Act contract
A Mills Act contract doesn’t replace design review. The work in your rehabilitation plan still goes through the same review as any other project.
What to keep in mind
- Contract work should follow the Secretary of the Interior’s Standards and the City’s design standards. Repair comes before replacement.
- Staff note Mills Act status on minor review applications, so expect a close look at historic materials.
- Plan bigger items like a re-roof, window restoration or foundation work early. Some need staff review, and changes to rooflines or additions go to the Committee.
- Keep approvals, permits and before/after photos with your contract records for inspections.
- The draft ordinance would add homes with active Mills Act contracts to a new Orange Register, if the City already has documentation that they qualify.
The Construction Acknowledgment
For some projects, the City asks the owner, contractor and architect to sign a Historic Property Construction Acknowledgment. By signing, you agree to:
- Keep the character-defining features staff lists for your property.
- Do only the work described in your approved scope.
- Stop work immediately and call Historic Preservation staff if the work turns up hidden damage or structural failure, or needs more work than planned.
- Tell your contractor about these requirements.
If work leads to unpermitted demolition of all or part of the structure, the owner faces civil penalties, and the City may refuse any permit for one year (OMC 17.10.090 E).
Proposed changes to design review
The rules above are in effect today. Two updates are worth knowing about.
New Historic Preservation Ordinance
Approved on first reading on Nov. 10, 2026. Not yet adopted. It returns to City Council for a second reading, tentatively Nov. 24 or Dec. 8 (TBD), and is adopted if approved there. Until then, the current rules on this page apply. The ordinance (Final Administrative Draft v5, Aug. 31, 2026) would replace the Design Review Committee with a new Heritage Commission and sort projects into three tiers:
It also adds an optional early conceptual review with preservation staff before you submit.
2024 Historic Preservation Objective Design Standards
In September 2024 the City added objective design standards for Old Towne. They are written for certain multifamily and mixed-use housing projects that state housing laws streamline. They turn the 2018 guidance into measurable rules. For example:
- Replacing intact or repairable historic features is prohibited.
- Unpainted historic masonry, concrete or wood can’t be painted.
- Historic properties need an evaluation by a qualified preservation professional.
Most single-family projects still follow the 2018 standards. If you’re planning units, ask staff which set applies.
Forms and source documents
These are the City’s documents, either linked from the City’s website or posted here as copies. Always check with the City for the latest version.
Contacts
Historic Preservation
Community Development Department
300 E. Chapman Ave., Orange, CA 92866
714-744-7200
Trees and landscape plans
Community Services Department handles tree removal permits and landscape inspections.
714-532-6464
Questions for us
Ask the helper. If it can’t answer, it can send your question to the team at Mills Act Orange, and they’ll email you back.